This form can be used to progress the construction of a project or item when participating in the bidding or construction bidding.
In this form the progress of construction according to the number of construction days, you can easily modify the date or week of construction. Can insert column Unit, volume, or column number of construction date.
This is the most common field record, the information is empty so that it can be used flexibly in any situation outside the construction site.
In reality, there are many unplanned problems that need to be recognized and agreed by the parties for smooth work. And the record is that the field record.
Site engineering can print this generic form and always carry it in pairs when needed to handle any work that may be required. Because it is a generic template, it is very flexible and can be used for every project, every situation.
This is a steel statistic that I like and always use when doing the work of steel quantity taking off.
In the work of disassembling the volume, you can see the most bored steel statistics, and thanks to the steel statistics table that I find this job is light and easy.
In fact, the steel statistics table is a very popular and widely known. However, the steel statistics that I share in this article have some small but very intuitive and efficient customizations that make steel statistics simpler, easier to visualize from drawing to statistics and fewer errors. This is the most used steel statistic. Since I used it I did not feel afraid of steel quantity taking off anymore.
There are two things I saw in the steel statistics are:
-Shows the shape and size of each steel tree, making the calculation more intuitive, simpler and less error-prone. The length of the steel will be automatically calculated based on the length of the details.
-The volume of steel is calculated by calculating the steel volume and then multiplied by the specific gravity of the steel is 7850 kg / m3. Just do not need to look at the individual weight table of each different steel.
This file is used when removing steel mass in construction components, such as civil works, or technical infrastructure, drainage, etc.
The brown data in the spreadsheet is the data that needs to be entered, determined according to the design drawing. Other metrics and results are automatically calculated according to the established formula.